Matters needing attention in installation of aluminum honeycomb curtain wall
時間:2024-07-18 閱讀: 4602
The installation process of the aluminum honeycomb curtain wall aluminum veneer is: measuring the flow rate-anchoring the bracket point-force frame installation-panel and component assembly-sealant filling-removing the protective film and cleaning the glass surface curtain wall. During the installation process, please pay attention to the following issues.

1 The measured value should match the measured value of the main structure, and the horizontal elevation should be drawn from the ground layer by layer to avoid accumulation of errors. When measuring, the wind should not exceed four levels. The ink line should pop out along the outside of the floor, or the piano line should be used to determine the plane datum line of the curtain wall. Starting from the reference line, the relative distance is the plane of the curtain wall, and the front and back positions of the columns are determined based on this line, thereby determining the position of the entire curtain wall.

2 Columns are usually vertical members and are one of the keys to installing curtain walls. Its accuracy and quality will affect the installation quality of the entire curtain wall. The allowable deviation between the plane axis of the combined curtain wall and the outer plane axis of the building should be controlled within 2mm, especially for curved, flat, round, and enclosed curtain walls. The distance between the inner axis and the outer axis will affect the perimeter of the curtain wall. It should be taken seriously.

3 The column can be one-storey high or two-storey high. The whole is one, and the length can reach 7.5m. There should be a certain gap at the joint, not less than 10mm, using the sleeve connection method. If the connection between the connecting piece and the embedded part is two layers or a whole, in order to improve the rigidity of the curtain wall frame, the connection point between the column and the main structure can be appropriately increased. With hinge and rigid joint structure, the hinge can only resist horizontal force. When the joint position is a brick structure, the joint cannot be used with expansion bolts, but should be fixed by wall bolts. The vertical force is transmitted to the main structure.

4 The beam is usually a horizontal member, which is a section embedded in the column, and the connecting members at both ends of the beam are installed at the predetermined position of the column. The beam is placed on the connecting piece, not fixed, and the length of the blanking is intentionally shortened during the production process, so that there is a certain gap at the joint. Because the columns are connected by sleeves, there are gaps at the joints, and there are also gaps between the beams and the columns. Therefore, the columns and beams can be installed to form a frame with a certain deformability to adapt and deform. Eliminate building deformation and temperature deformation. Improving the impact of its carrying capacity. However, if the curved shape of the beam is a broken line or a chamfer, the beam and connectors should be fixed to prevent the beam from falling. The frame of aluminum honeycomb curtain wall aluminum veneer should use aluminum profile with anodized surface, and steel cannot be used. If the frame and the wall plate are two kinds of metals, the electrode potential difference is likely to occur, and the aluminum plate is corroded. Do not use ordinary screws. Each vertical material of the frame system should be firmly connected with the embedded iron parts of the main structure, and the horizontal and vertical materials should be fixed with stainless steel bolts to ensure the durability of the installation.

5 In addition to the decorative effect of the facade, the joint width of the aluminum honeycomb curtain wall and aluminum veneer should also be considered, and the thermal expansion after thermal expansion should be considered. The joints must be sealed with weather-resistant rubber caulking materials to prevent gas penetration and rainwater leakage. Please note that when caulking and weathering glue:

1 Fully clean the gap between the aluminum veneers of the aluminum honeycomb curtain wall to ensure that the bonding surface is clean and dry.

2 To adjust the depth of the seam, avoid the three sides of the glue, and then fill the seam with PVC foam material (small round rod).

3 After applying the glue, the surface of the glue should be smoothed to remove the excess glue.

4 Pay attention to maintenance after injection, and do not get dust and scratches before the glue is completely cured.

聯(lián)系我們
Shenzhen Zhongda Aluminum Products Decoration Co., Ltd.
Telephon:86-755-23499577 
Fax:86-755-23499552 
Zheng Ge:13510710905
Zheng Junji:13640954348
Mailbox:szzdpd@163.com 
Address: 1st Floor, Building B, No. 3, Minying Road, Shilong Community, Shiyan Street, Baoan District, Shenzhen
Website:http://www.bio-taobao.com

掃一掃 更多精彩
幕墻鋁單板廠家,氟碳噴涂鋁單板定做安裝,平面鋁單板建材訂購,單層鋁單板批發(fā)價格
版權(quán)所有:深圳市眾達鋁制品裝飾有限公司    粵ICP備14077854號
亚洲人成人无码网WWW国产| 成人爽A毛片免费视频| 亚洲成a人v欧美综合天堂麻豆| 免费A级毛片无码免费视频首页| 无人区码卡二卡乱码中国字幕| 女人和拘做受A级毛片| 探花口爆颜射乳交日韩| 成年女人免费碰碰视频| 国产又粗又猛又黄又爽无遮挡| 国产午夜精品一区二区三区| 可以在线看AV的网站| 国产线播放免费人成视频播放| 69久久夜色精品国产69| 国产无遮挡又黄又爽在线观看| 午夜福利一区二区三区在线观看| 亚洲一区二区三区在线观看精品中文| 亚洲精品久久久www小说| 亚洲日产乱码一二三区别| 成人无码特黄特黄AV片在线| 中文字幕人妻丝袜成熟乱| 日本人妻丰满熟妇久久久久久| 2020久久国产综合精品SWAG| 精品久久无码中文字幕| 最近最好看的2018中文字幕电视剧| 欧美日韩免费专区在线| 久久久久久精品免费免费69| 成全动漫视频在线观看免费高清| 国产69精品久久久久777| 成人欧美一区二区三区1314| 亚洲AV永久无码精品天堂动漫| 一本大道一卡二大卡三卡免费| 文中字幕一区二区三区视频播放| 日本国产成人国产在线播放| 蜜臀av无码人妻精品| 国产成人精品亚洲一区二区三区| 国产精品久久久久秋霞鲁丝| 午夜A级毛片免费观看| 国产成人综合久久久久久| 欧美精品V国产精品V日韩精品| 欧美多人片高潮野外做片黑人| 国产亚洲AV夜间福利香蕉149|