亚洲欧美日韩在线一区,亚洲av无码乱码在线观看野外,亚洲av人人澡人人爽人人夜夜,国内精品伊人久久久久av影院

您好,歡迎來到深圳市眾達鋁制品裝飾有限公司官網(wǎng)!
深圳市眾達鋁制品裝飾有限公司
一家集設(shè)計、生產(chǎn)、安裝、表面涂裝于一體的全方位優(yōu)秀企業(yè)
全國服務(wù)熱線
86-755-23499577
網(wǎng)站首頁 - News - 行業(yè)新聞 - Matters needing attention in installation of aluminum honeycomb curtain wall
Matters needing attention in installation of aluminum honeycomb curtain wall
時間:2024-07-18 閱讀: 4508
The installation process of the aluminum honeycomb curtain wall aluminum veneer is: measuring the flow rate-anchoring the bracket point-force frame installation-panel and component assembly-sealant filling-removing the protective film and cleaning the glass surface curtain wall. During the installation process, please pay attention to the following issues.

1 The measured value should match the measured value of the main structure, and the horizontal elevation should be drawn from the ground layer by layer to avoid accumulation of errors. When measuring, the wind should not exceed four levels. The ink line should pop out along the outside of the floor, or the piano line should be used to determine the plane datum line of the curtain wall. Starting from the reference line, the relative distance is the plane of the curtain wall, and the front and back positions of the columns are determined based on this line, thereby determining the position of the entire curtain wall.

2 Columns are usually vertical members and are one of the keys to installing curtain walls. Its accuracy and quality will affect the installation quality of the entire curtain wall. The allowable deviation between the plane axis of the combined curtain wall and the outer plane axis of the building should be controlled within 2mm, especially for curved, flat, round, and enclosed curtain walls. The distance between the inner axis and the outer axis will affect the perimeter of the curtain wall. It should be taken seriously.

3 The column can be one-storey high or two-storey high. The whole is one, and the length can reach 7.5m. There should be a certain gap at the joint, not less than 10mm, using the sleeve connection method. If the connection between the connecting piece and the embedded part is two layers or a whole, in order to improve the rigidity of the curtain wall frame, the connection point between the column and the main structure can be appropriately increased. With hinge and rigid joint structure, the hinge can only resist horizontal force. When the joint position is a brick structure, the joint cannot be used with expansion bolts, but should be fixed by wall bolts. The vertical force is transmitted to the main structure.

4 The beam is usually a horizontal member, which is a section embedded in the column, and the connecting members at both ends of the beam are installed at the predetermined position of the column. The beam is placed on the connecting piece, not fixed, and the length of the blanking is intentionally shortened during the production process, so that there is a certain gap at the joint. Because the columns are connected by sleeves, there are gaps at the joints, and there are also gaps between the beams and the columns. Therefore, the columns and beams can be installed to form a frame with a certain deformability to adapt and deform. Eliminate building deformation and temperature deformation. Improving the impact of its carrying capacity. However, if the curved shape of the beam is a broken line or a chamfer, the beam and connectors should be fixed to prevent the beam from falling. The frame of aluminum honeycomb curtain wall aluminum veneer should use aluminum profile with anodized surface, and steel cannot be used. If the frame and the wall plate are two kinds of metals, the electrode potential difference is likely to occur, and the aluminum plate is corroded. Do not use ordinary screws. Each vertical material of the frame system should be firmly connected with the embedded iron parts of the main structure, and the horizontal and vertical materials should be fixed with stainless steel bolts to ensure the durability of the installation.

5 In addition to the decorative effect of the facade, the joint width of the aluminum honeycomb curtain wall and aluminum veneer should also be considered, and the thermal expansion after thermal expansion should be considered. The joints must be sealed with weather-resistant rubber caulking materials to prevent gas penetration and rainwater leakage. Please note that when caulking and weathering glue:

1 Fully clean the gap between the aluminum veneers of the aluminum honeycomb curtain wall to ensure that the bonding surface is clean and dry.

2 To adjust the depth of the seam, avoid the three sides of the glue, and then fill the seam with PVC foam material (small round rod).

3 After applying the glue, the surface of the glue should be smoothed to remove the excess glue.

4 Pay attention to maintenance after injection, and do not get dust and scratches before the glue is completely cured.

聯(lián)系我們
Shenzhen Zhongda Aluminum Products Decoration Co., Ltd.
Telephon:86-755-23499577 
Fax:86-755-23499552 
Zheng Ge:13510710905
Zheng Junji:13640954348
Mailbox:szzdpd@163.com 
Address: 1st Floor, Building B, No. 3, Minying Road, Shilong Community, Shiyan Street, Baoan District, Shenzhen
Website:http://www.bio-taobao.com

掃一掃 更多精彩
幕墻鋁單板廠家,氟碳噴涂鋁單板定做安裝,平面鋁單板建材訂購,單層鋁單板批發(fā)價格
版權(quán)所有:深圳市眾達鋁制品裝飾有限公司    粵ICP備14077854號
护士被强女千到高潮视频| 99精品免费久久久久久久久蜜桃| 欧美又大粗又爽又黄大片视频| 国产精品一亚洲av日韩av欧| 日韩激情电影一区二区在线| 亚洲精品综合在线影院| 国产清纯美女爆白浆视频| 亚洲伊人成综合网| 久久97久久97精品免视看| 国产无遮挡又黄又爽在线观看| 免费无遮挡无码视频在线观看| 性欧美大战久久久久久久久| 波多野42部无码喷潮| 国产精品午夜无码体验区| 狠狠躁夜夜躁人人爽天天天天| 情感的禁区日本在线观看免费| 久久精品国产亚洲av蜜臀| 精品爆乳一区二区三区无码AV| 丰满的少妇被猛烈进入白浆| 亚洲日产中文字幕无码| 亚洲一区二区三区偷拍女厕| 真人无码作爱免费视频网站| 中文字幕无线码一区2020青青| 亚洲精品无码久久久| 亚洲欧洲专线一区| 夜夜添夜夜添夜夜摸夜夜摸| 久久九九久精品国产日韩经典| YW尤物AV无码点击进入影院| 欧美伦费免费全部午夜最新| 日韩精品人妻AV一区二区三区| 300部国产真实乱| 久久久久人妻精品一区蜜桃网站| 色欲综合久久中文字幕网| 一区二区在线 | 欧洲| 嫖妓丰满肥熟妇在线精品| 欧美成人片在线观看| 日韩内射美女人妻一区二区三区| 国产一区二区三区AV在线无码观看| 老司机精品成人无码AV| 女班长裸体扒开两腿让我桶| 在教室伦流澡到高潮hgl视频|