亚洲欧美日韩在线一区,亚洲av无码乱码在线观看野外,亚洲av人人澡人人爽人人夜夜,国内精品伊人久久久久av影院

您好,歡迎來到深圳市眾達鋁制品裝飾有限公司官網(wǎng)!
深圳市眾達鋁制品裝飾有限公司
一家集設(shè)計、生產(chǎn)、安裝、表面涂裝于一體的全方位優(yōu)秀企業(yè)
全國服務(wù)熱線
86-755-23499577
網(wǎng)站首頁 - News - 行業(yè)新聞 - Matters needing attention in installation of aluminum honeycomb curtain wall
Matters needing attention in installation of aluminum honeycomb curtain wall
時間:2024-07-18 閱讀: 4509
The installation process of the aluminum honeycomb curtain wall aluminum veneer is: measuring the flow rate-anchoring the bracket point-force frame installation-panel and component assembly-sealant filling-removing the protective film and cleaning the glass surface curtain wall. During the installation process, please pay attention to the following issues.

1 The measured value should match the measured value of the main structure, and the horizontal elevation should be drawn from the ground layer by layer to avoid accumulation of errors. When measuring, the wind should not exceed four levels. The ink line should pop out along the outside of the floor, or the piano line should be used to determine the plane datum line of the curtain wall. Starting from the reference line, the relative distance is the plane of the curtain wall, and the front and back positions of the columns are determined based on this line, thereby determining the position of the entire curtain wall.

2 Columns are usually vertical members and are one of the keys to installing curtain walls. Its accuracy and quality will affect the installation quality of the entire curtain wall. The allowable deviation between the plane axis of the combined curtain wall and the outer plane axis of the building should be controlled within 2mm, especially for curved, flat, round, and enclosed curtain walls. The distance between the inner axis and the outer axis will affect the perimeter of the curtain wall. It should be taken seriously.

3 The column can be one-storey high or two-storey high. The whole is one, and the length can reach 7.5m. There should be a certain gap at the joint, not less than 10mm, using the sleeve connection method. If the connection between the connecting piece and the embedded part is two layers or a whole, in order to improve the rigidity of the curtain wall frame, the connection point between the column and the main structure can be appropriately increased. With hinge and rigid joint structure, the hinge can only resist horizontal force. When the joint position is a brick structure, the joint cannot be used with expansion bolts, but should be fixed by wall bolts. The vertical force is transmitted to the main structure.

4 The beam is usually a horizontal member, which is a section embedded in the column, and the connecting members at both ends of the beam are installed at the predetermined position of the column. The beam is placed on the connecting piece, not fixed, and the length of the blanking is intentionally shortened during the production process, so that there is a certain gap at the joint. Because the columns are connected by sleeves, there are gaps at the joints, and there are also gaps between the beams and the columns. Therefore, the columns and beams can be installed to form a frame with a certain deformability to adapt and deform. Eliminate building deformation and temperature deformation. Improving the impact of its carrying capacity. However, if the curved shape of the beam is a broken line or a chamfer, the beam and connectors should be fixed to prevent the beam from falling. The frame of aluminum honeycomb curtain wall aluminum veneer should use aluminum profile with anodized surface, and steel cannot be used. If the frame and the wall plate are two kinds of metals, the electrode potential difference is likely to occur, and the aluminum plate is corroded. Do not use ordinary screws. Each vertical material of the frame system should be firmly connected with the embedded iron parts of the main structure, and the horizontal and vertical materials should be fixed with stainless steel bolts to ensure the durability of the installation.

5 In addition to the decorative effect of the facade, the joint width of the aluminum honeycomb curtain wall and aluminum veneer should also be considered, and the thermal expansion after thermal expansion should be considered. The joints must be sealed with weather-resistant rubber caulking materials to prevent gas penetration and rainwater leakage. Please note that when caulking and weathering glue:

1 Fully clean the gap between the aluminum veneers of the aluminum honeycomb curtain wall to ensure that the bonding surface is clean and dry.

2 To adjust the depth of the seam, avoid the three sides of the glue, and then fill the seam with PVC foam material (small round rod).

3 After applying the glue, the surface of the glue should be smoothed to remove the excess glue.

4 Pay attention to maintenance after injection, and do not get dust and scratches before the glue is completely cured.

聯(lián)系我們
Shenzhen Zhongda Aluminum Products Decoration Co., Ltd.
Telephon:86-755-23499577 
Fax:86-755-23499552 
Zheng Ge:13510710905
Zheng Junji:13640954348
Mailbox:szzdpd@163.com 
Address: 1st Floor, Building B, No. 3, Minying Road, Shilong Community, Shiyan Street, Baoan District, Shenzhen
Website:http://www.bio-taobao.com

掃一掃 更多精彩
幕墻鋁單板廠家,氟碳噴涂鋁單板定做安裝,平面鋁單板建材訂購,單層鋁單板批發(fā)價格
版權(quán)所有:深圳市眾達鋁制品裝飾有限公司    粵ICP備14077854號
精品国偷自产在线视频99| 色欲aⅴ亚洲情无码av蜜桃| 国产午夜精品无码| 蜜臀少妇人妻在线| 无遮挡又爽又刺激的视频| 大屁股熟女一区二区三区| 国产成A人片在线观看| 少妇伦子伦情品无吗| 中文字幕乱码人妻无码久久| 国产大片黄在线观看私人影院| 亚洲区色欧美另类图片| 欧美VA亚洲VA在线观看| 伊人无码精品久久一区二区| 不卡高清AV手机在线观看| 亚洲成在人线AV中文字幕喷水| 久久人人97超碰精品| 欧美性开放情侣网站| 天天躁日日躁狠狠躁人妻| 北条麻妃国产九九九精品视频| 人人爽人人爽人人片A免费| 亚洲性线免费观看视频成熟| 久久久久久久精品国产亚洲| 熟妇的奶头又大又长奶水视频| 国产成人综合精品无码| 色婷婷婷亚洲综合丁香五月| 亚洲国产成人精品无码区在线观看| 亚洲国产精品久久久久婷婷老年| 精品国产亚洲AV麻豆尤物| 国产玖玖玖九九精品视频靠爱| 四虎永久在线精品免费一区二区| 天堂中文8资源在线8| 成人做爰www免费看视频韩国| 毛片免费观看天天干天天爽| 亚洲中文字幕在线乱码| 久久99精品久久只有精品| 又色又爽又黄的视频网站| 少妇人妻精品一区二区三区| 久久久久无码精品国产蜜桃| 日本免费一区二区三区| 狠狠躁天天躁中文字幕无码| 狠狠色噜噜狠狠狠狠97俺也去|