亚洲欧美日韩在线一区,亚洲av无码乱码在线观看野外,亚洲av人人澡人人爽人人夜夜,国内精品伊人久久久久av影院

您好,歡迎來到深圳市眾達鋁制品裝飾有限公司官網(wǎng)!
深圳市眾達鋁制品裝飾有限公司
一家集設計、生產(chǎn)、安裝、表面涂裝于一體的全方位優(yōu)秀企業(yè)
全國服務熱線
86-755-23499577
網(wǎng)站首頁 - News - 行業(yè)新聞 - Matters needing attention in installation of aluminum honeycomb curtain wall
Matters needing attention in installation of aluminum honeycomb curtain wall
時間:2024-07-18 閱讀: 4604
The installation process of the aluminum honeycomb curtain wall aluminum veneer is: measuring the flow rate-anchoring the bracket point-force frame installation-panel and component assembly-sealant filling-removing the protective film and cleaning the glass surface curtain wall. During the installation process, please pay attention to the following issues.

1 The measured value should match the measured value of the main structure, and the horizontal elevation should be drawn from the ground layer by layer to avoid accumulation of errors. When measuring, the wind should not exceed four levels. The ink line should pop out along the outside of the floor, or the piano line should be used to determine the plane datum line of the curtain wall. Starting from the reference line, the relative distance is the plane of the curtain wall, and the front and back positions of the columns are determined based on this line, thereby determining the position of the entire curtain wall.

2 Columns are usually vertical members and are one of the keys to installing curtain walls. Its accuracy and quality will affect the installation quality of the entire curtain wall. The allowable deviation between the plane axis of the combined curtain wall and the outer plane axis of the building should be controlled within 2mm, especially for curved, flat, round, and enclosed curtain walls. The distance between the inner axis and the outer axis will affect the perimeter of the curtain wall. It should be taken seriously.

3 The column can be one-storey high or two-storey high. The whole is one, and the length can reach 7.5m. There should be a certain gap at the joint, not less than 10mm, using the sleeve connection method. If the connection between the connecting piece and the embedded part is two layers or a whole, in order to improve the rigidity of the curtain wall frame, the connection point between the column and the main structure can be appropriately increased. With hinge and rigid joint structure, the hinge can only resist horizontal force. When the joint position is a brick structure, the joint cannot be used with expansion bolts, but should be fixed by wall bolts. The vertical force is transmitted to the main structure.

4 The beam is usually a horizontal member, which is a section embedded in the column, and the connecting members at both ends of the beam are installed at the predetermined position of the column. The beam is placed on the connecting piece, not fixed, and the length of the blanking is intentionally shortened during the production process, so that there is a certain gap at the joint. Because the columns are connected by sleeves, there are gaps at the joints, and there are also gaps between the beams and the columns. Therefore, the columns and beams can be installed to form a frame with a certain deformability to adapt and deform. Eliminate building deformation and temperature deformation. Improving the impact of its carrying capacity. However, if the curved shape of the beam is a broken line or a chamfer, the beam and connectors should be fixed to prevent the beam from falling. The frame of aluminum honeycomb curtain wall aluminum veneer should use aluminum profile with anodized surface, and steel cannot be used. If the frame and the wall plate are two kinds of metals, the electrode potential difference is likely to occur, and the aluminum plate is corroded. Do not use ordinary screws. Each vertical material of the frame system should be firmly connected with the embedded iron parts of the main structure, and the horizontal and vertical materials should be fixed with stainless steel bolts to ensure the durability of the installation.

5 In addition to the decorative effect of the facade, the joint width of the aluminum honeycomb curtain wall and aluminum veneer should also be considered, and the thermal expansion after thermal expansion should be considered. The joints must be sealed with weather-resistant rubber caulking materials to prevent gas penetration and rainwater leakage. Please note that when caulking and weathering glue:

1 Fully clean the gap between the aluminum veneers of the aluminum honeycomb curtain wall to ensure that the bonding surface is clean and dry.

2 To adjust the depth of the seam, avoid the three sides of the glue, and then fill the seam with PVC foam material (small round rod).

3 After applying the glue, the surface of the glue should be smoothed to remove the excess glue.

4 Pay attention to maintenance after injection, and do not get dust and scratches before the glue is completely cured.

聯(lián)系我們
Shenzhen Zhongda Aluminum Products Decoration Co., Ltd.
Telephon:86-755-23499577 
Fax:86-755-23499552 
Zheng Ge:13510710905
Zheng Junji:13640954348
Mailbox:szzdpd@163.com 
Address: 1st Floor, Building B, No. 3, Minying Road, Shilong Community, Shiyan Street, Baoan District, Shenzhen
Website:http://www.bio-taobao.com

掃一掃 更多精彩
幕墻鋁單板廠家,氟碳噴涂鋁單板定做安裝,平面鋁單板建材訂購,單層鋁單板批發(fā)價格
版權(quán)所有:深圳市眾達鋁制品裝飾有限公司    粵ICP備14077854號
日本少妇高潮正在线播放| 亚洲日韩一区二区三区四区高清| 在线成人一区二区| 欧美综合自拍亚洲综合百度| 精品无码一区二区三区爱欲| 亚洲AV永久无码精品天堂动漫| 精品国产一区二区三区免费| 久久久久久亚洲精品无码| 亚洲AV无码东方伊甸园| 欧美国产日产一区二区| 国内精品视频一区二区三区| 亚洲欧美一区二区成人片| 久久天天躁狠狠躁夜夜免费观看| 最爽无遮挡行房视频| 男人女人午夜视频免费| 一本色道无码道dvd在线观看| 一本大道加勒比久久综合| 国产大屁股喷水视频在线观看| 欧美一区二区三区成人片在线| 亚洲AV综合色区无码一区| 国内精品乱码卡一卡2卡麻豆| 女人张开腿让男人桶个爽| 午夜精品影视国产一区在线麻豆| 国产女人高潮叫床视频| 国产高清色高清在线观看| 亚洲综合AV一区二区三区不卡| 精品无码一区二区三区| 无码H黄肉3D动漫在线观看| 国产免码va在线观看免费| 国产成A人亚洲精V品无码性色| 熟妇人妻一区二区三区四区| 亚洲和欧洲一卡二卡三卡| 亚洲麻豆AV成本人无码网站| 久久久一本线一区二区| 婷婷五月深深久久精品| 无遮挡日本H熟肉动漫在线观看| 日本少妇高潮正在线播放| 四虎亚洲精品成人A在线观看| 男女18禁啪啪无遮挡网站| 国产精品乱码在线观看| 变态 另类 欧美 大码 日韩|